Measurement Testing
A Resource Dedicated to Environmental Testing, EMC Testing, Vibration Testing and related areas
 
Home • Forum • EMC/EMI • Vibration Testing/Analysis  • Environmental Testing • Books • Links • Glossary

 
BEST PRACTICES: CLEAN-ROOM CONSTRUCTION / INSTALLATION

 
Post new topic   Reply to topic    Measurement Testing Forum Index -> Clean Rooms
Author Message
Mjr
Site Admin


Joined: 13 Jul 2005
Posts: 294

PostPosted: Fri Nov 23, 2007 12:04 pm    Post subject: BEST PRACTICES: CLEAN-ROOM CONSTRUCTION / INSTALLATION Reply with quote



Complete in-house laminating, product fabrication and assembly, and an array of automated equipment. These fabrication practices should include everything ... from wall, floor, ceiling, and air handling systems ... all to exact tolerances.
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Measurement Testing Forum Index -> Clean Rooms All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group