Measurement Testing
A Resource Dedicated to Environmental Testing, EMC Testing, Vibration Testing and related areas
 
Home • Forum • EMC/EMI • Vibration Testing/Analysis  • Environmental Testing • Books • Links • Glossary

 
Clean-Room Details and Description

 
Post new topic   Reply to topic    Measurement Testing Forum Index -> Clean Rooms
Author Message
Mjr
Site Admin


Joined: 13 Jul 2005
Posts: 294

PostPosted: Fri Nov 23, 2007 12:24 pm    Post subject: Clean-Room Details and Description Reply with quote

Are you going to invest in a clean-room?

Most clean-room contractors and installers need to know your requirements for the desired cleanroom(s). Begin here by jotting down the answers to the following questions:

Cleanroom Application: What function(s)/process(es) should the cleanroom be designed to support?

DIMENSIONS
1. Cleanroom Dimensions: (Width Length Heigth)
2. Existing Interior Ceiling Height: (Minimum 20" Clearance recommended)
3. Gown Up Area: (Width Length Heigth)

HARDWALL, STRETCHWALL, SOFTWALL

1. Construction Style: (Softwall, Stretchwall, Hardwall)
2. Cleanroom Classification: (Don't Know 100 1,000 10,000 100,000)
3. Hardwall Panel Material (various)
4. Stretchwall/Softwall Panel Material (various)

DOORS

1. How many single (4' standard) swing doors required?
2. How many double (8' standard) swing doors required?
3. How many sliding (8' standard) doors required?
4. Would you prefer Strip Curtains at entry/exit? Yes No
5. Would you prefer 0.08" x 8" wide or 0.06" x 14" strips? 0.08" x 8" 0.06" x 14"

ELECTRICAL

1. How many 120 volt Duplex Light Switches are required?
2. Specify location of Light Switches
3. How many 120Volt Duplex Outlets are required?
4. Specify location of Duplex Outlets
5. Number of 24" x 24" x24" Pass-Thru cubes?
6. Sprinkler System required? Yes/No
7. Seismic Zone ratings required? Yes/No
8. Date for completion: Completed and fully operational on:
9. This cleanroom project is: Approved & Funded/Budgetary

CLEANROOM ADD-ON COMPONENTS
- HEPA Filter
- Portable Process Environments

Now you're ready to contact installers and negotiate on price and time estimates.

Good luck!
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Measurement Testing Forum Index -> Clean Rooms All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group